Licensed & Insured: CSLB #1057926
Trusted Plumbing Experts Across the Bay Area

trenchless sewer and water line replacement - how it works and why its the best option
​
What Is Trenchless Sewer Line Replacement?
Trenchless sewer replacement is an advanced method that allows our team to replace underground sewer lines through small access points, avoiding the need to dig trenches across your yard, driveway, or sidewalk.
Using pipe bursting or pipe lining, we can install new, long-lasting sewer lines quickly and cleanly—ideal for homes with landscaping, hardscape, or tight access areas.
Benefits of Trenchless Sewer Replacement
-
Minimal Digging – Preserve your landscaping, hardscape, and structures
-
Fast Turnaround – Most jobs completed within 1 to 2 days
-
Durable Materials – We install seamless HDPE or epoxy-lined pipes rated for 50+ years
-
Lower Restoration Costs – Avoid repairing lawns, patios, or concrete
-
Code-Compliant – All work meets California plumbing code and inspection standards
Methods We Use
Pipe Bursting
Best for replacing collapsed or severely damaged pipes. A cone-shaped bursting head fractures the old pipe while simultaneously pulling in a new HDPE pipe.
Pipe Lining (CIPP - Cured-In-Place Pipe)
Ideal for pipes with cracks, corrosion, or joint separation. A resin-saturated liner is inserted into the old pipe and cured to create a seamless new inner wall.
Signs You May Need Trenchless Sewer Replacement
-
Recurring drain clogs or backups
-
Sewer odors inside or outside the home
-
Multiple slow drains or gurgling noises
-
Soggy, sunken, or unusually green spots in your yard
-
Sewer lines over 40 years old or made from clay, cast iron, or Orangeburg
Trenchless vs. Traditional Replacement
Trenchless:
-
Minimal surface disruption
-
1–2 day turnaround
-
No major excavation or hardscape damage
Traditional:
-
Requires full trenching along the sewer line
-
3–7 day project timeline
-
Significant yard and property restoration afterward
How Long Does It Take?
Most trenchless sewer replacements are completed in one to three days, depending on site conditions and permit timing. Our team handles all inspections and final testing.
​